# Inside the Army’s Project Convergence Capstone 5: CJADC2 Tested at Scale

- Link: https://futuremilitarytech.com/inside-the-armys-project-convergence-capstone-5-cjadc2-tested-at-scale/
- Published: 2026-06-18T17:42:08+00:00
- Author: Future Military Technologies

In a building at the Army Research Laboratory just outside Washington, D.C., a group
of reporters put on augmented reality headsets and looked down at a war.

Spread below them in a physics-based 3D simulation was a recreated chunk of Nevada
and Southern California, extending out to the Pacific Ocean. Green laser-like lines
streaked skyward from the terrain, representing connectivity links to satellites
and high-altitude balloons carrying communications payloads. Purple and pink beams
showed radar coverage. Light-pink beams traced electronic warfare jamming arcs across
the desert. Tanks, robotic vehicles, artillery positions, fixed- and rotary-wing
aircraft, and small surface vessels off San Clemente Island populated the scene.

Then a maritime battle broke out off the California coast. Fighter jets and autonomous
wingmen launched from Nellis Air Force Base near Las Vegas. Land forces fired precision
strike missiles at the National Training Center at Fort Irwin, California, softening
enemy defences ahead of a joint forcible entry operation. Unmanned submarines tracked
an enemy cruiser from below.

The tool making all of this visible is a product from defence technology company**
Anduril Industries** called the **Augmented Reality Sandtable** – a physics-based
simulation environment operated through standard AR headsets that allows multiple
observers to watch, and interact with, the same live or reconstructed battle. It
is a visualisation tool, not a command-and-control system, and the Army has been
careful to draw that distinction. But as a demonstration of the sheer complexity
of what **Project Convergence Capstone 5 (PC-C5)** attempted between March 10 and
April 18, 2025, it proved more effective than any slide deck.

---

## What Project Convergence Is, and What It Is Not

**Project Convergence** is the U.S. Army’s premier annual experimentation programme,
organised by **Army Futures Command** and designed to test how well sensors, shooters,
data networks, and decision-support software can be knitted together across services
and allied nations. It is not a traditional military exercise in which units practise
rehearsed tasks. It is, as Army officials repeatedly stress, an experiment: a structured
attempt to discover what works, what breaks, and what needs to change before any
of these technologies reach operational units.

PC-C5 was the largest and most ambitious iteration to date. Around 6,000 troops 
from the U.S. Army, Navy, Air Force, Space Force, and Marine Corps took part, alongside
armed forces from the United Kingdom, Australia, Canada, New Zealand, France, and
Japan (U.S. Army, April 4, 2025). Geographically, it stretched from the National
Training Center at Fort Irwin in California’s Mojave Desert north to the Nellis 
Test and Training Range near Las Vegas, south to Naval Base Coronado and Marine 
Corps Base Camp Pendleton on the California coast, and out to San Clemente Island
off the Pacific.

At its core, PC-C5 was driving toward a specific Pentagon goal: **Combined Joint
All-Domain Command and Control**, known as **CJADC2** (pronounced “C-jad-C-2”). 
The concept calls for near-seamless data links between sensors and weapon systems
across every domain – land, sea, air, space, and cyberspace – spanning all U.S. 
military services and allied forces simultaneously, with artificial intelligence(
AI) tools to help commanders make faster decisions using assets from any of those
domains at once. That remains an ambitious and unfinished goal, but PC-C5 moved 
the programme further toward it than any previous iteration.

---

## Two Phases, One Integrated Fight

PC-C5 was divided into two parts, which Army officials called Scenario A and Scenario
B.

**Scenario A**, centred on the National Training Center, focused on corps-level 
and below operations. It assessed the Army’s **Next-Generation Command and Control(
NGC2)** architecture and linked Nellis Air Force Base and San Clemente Island into
a single operational picture. The scenario built around a maritime and special operations
effort to open a coastal corridor, then inserted a joint forcible entry force against
simulated enemy positions at Fort Irwin – connecting squad-level units at the lowest
tactical echelon all the way back to corps headquarters.

**Scenario B** operated at corps level and above, using an Indo-Pacific setting.
It focused more heavily on CJADC2 and demonstrated networked operations across Hawaii,
Japan, the Philippines, French Polynesia, and Australia, with data shared in near-
real-time with British, French, and Japanese partner forces (Defense One, May 5,
2025). This phase was primarily about proving that different nations and services,
running different software on different hardware, could contribute to a single coherent
operational picture and act on it together.

“We integrated it all into one coherent warfighting framework,” said **Lt. Gen. 
David Hodne**, director of Army Futures Command’s Futures and Concepts Center, at
a press briefing following the experiment. “From the National Training Center… to
Coronado, to Pendleton on the coast of California – we integrated all those capabilities
in support of a joint task force executing actual missions.”

[Note on Hodne’s status: At the time of PC-C5, Hodne held the title of director 
of the Futures and Concepts Center at Army Futures Command. He was subsequently 
nominated in July 2025 to lead the newly created Army Transformation and Training
Command – formed from the merger of Army Futures Command and Training and Doctrine
Command – and was promoted to four-star general that October. He was dismissed from
that position in April 2026 by Secretary of Defense Pete Hegseth (Stars and Stripes,
April 7, 2026).]

---

## The Data Problem at the Heart of Modern Command and Control

Perhaps the most candid and technically useful account of what the Army is actually
trying to fix came from **Maj. Gen. Patrick Ellis**, director of Army Futures Command’s
Command and Control Cross-Functional Team.

The Army does not have a data shortage, Ellis explained. It has a data organisation
problem. “It’s not always in the right spot or the right format. That’s been our
problem: we’ve had boxes that talk to boxes that talk to other boxes,” he said, 
capping the exchange rate at just under 25 words. “And if you want to interact with
that data, you’ve got to pull it out of the box, manipulate it, translate it, use
it, put it back in, re-translate it.”

The Army’s answer is what Ellis calls a clean-sheet approach: build a software layer
that organises all incoming data into a single common format and pushes it into 
a **common operating picture** – essentially a shared digital map – where every 
data point is clickable and every piece of relevant sensor data associated with 
that point comes up automatically. If the dot on the map represents an enemy tank,
any drone footage or other sensor data gathered and sorted by AI tools appears immediately
when a user selects it. No manual translation. No data locked inside proprietary
systems that cannot talk to each other.

Capstone 4, held in 2024, had a basic version of this common operating picture operating
at small-unit level. Capstone 5 expanded it to battalions, in two flavours: one 
optimised for combat operations and a second for logistics. The next target, for
Capstone 6, is to extend the same capability to divisions – organisations of close
to 10,000 soldiers. “That’s a big step for us, to go from one small organisation
of about 500 people to an entire division of almost 10,000,” Ellis noted. **Project
Convergence Capstone 6 is scheduled to begin in August 2026** (Defense One, May 
5, 2025).

**Lindsey Sheppard**, director of the Advanced Command and Control Accelerator within
the Pentagon’s Office of the Chief Digital and Artificial Intelligence Officer, 
said Capstone 5 also marked the first major experiment where her office demonstrated
its **edge data mesh** technology – a distributed data architecture that pushes 
relevant information directly to users in the field rather than requiring them to
pull it from a central server. In contested communications environments where bandwidth
is limited or intermittent, that distinction matters considerably.

---

## Mine Clearance Gets a Rethink

Among the most operationally grounded demonstrations in PC-C5 was a new approach
to clearing minefields, driven directly by lessons from the war in Ukraine.

The previous standard for U.S. minefield-clearing called for clearing a path of 
roughly 100 metres (330 feet). Minefields encountered in Ukraine routinely exceed
900 metres (3,000 feet), well beyond the reach of legacy wire-charge systems such
as the **Mine Clearing Line Charge**, which detonates a long explosive-laden cable
dragged across a field. Stretching that system to match modern minefield depths 
is not practical.

The approach demonstrated at Capstone 5 breaks the problem into stages. Small drones
first survey the field and map individual mine locations. That data feeds into the
common operating picture so every element of the force has an accurate, current 
picture of where each mine sits. An autonomous ground vehicle then deploys small
expendable drones – each on a one-way mission to destroy a single mine. A robotic
bulldozer follows to verify and clear the path mechanically. No soldier needs to
be anywhere near the minefield at any stage of the process.

The Army calls the small mine-hunting munition the **Ground Obstacle Breaching Lane
Neutralizer**, or **GOBLIN**. Army Staff Sgt. Jeremy Ephriam, assigned to the 36th
Engineer Brigade, was photographed preparing a GOBLIN for launch during the Fort
Irwin phase of PC-C5 (U.S. Army, April 4, 2025).

---

## Robots, Kamikaze Boats, and a Space Strike

Across Capstone 5’s various experiment “lanes,” several other technologies drew 
attention from briefers and observers.

A logistics lane tested an autonomous ground vehicle moving supplies between points
without human drivers – a capability with obvious implications for reducing the 
number of soldiers exposed in resupply convoys. In the maritime fight, **small unmanned
submarines** conducted subsurface surveillance of simulated enemy surface vessels,
while Marine Corps units at Camp Pendleton fired anti-ship missiles from shore. 
Unmanned surface vessels conducted what the briefers described as kamikaze-style
attacks on enemy ships – a tactic closely mirroring Ukrainian drone boat operations
against Russian naval assets in the Black Sea.

In a human-machine teaming demonstration, U.S. and British Army soldiers coordinated
combined assaults using a mix of robotic and manned vehicles, long-range fires, 
surface-to-air missiles, and electronic warfare equipment operating simultaneously.
Special operations forces on San Clemente Island deployed high-altitude balloons
carrying sensors and advanced communications payloads, while U.S. and UK commandos
directed electronic warfare assets against simulated enemy positions to jam their
communications.

Above all of this, a U.S. satellite was scripted to “disable” an enemy spacecraft,
severing one of its communications nodes – a representation of space-domain operations
that reflects the growing centrality of satellite connectivity to modern military
command and control, and the corresponding priority that adversaries place on disrupting
it.

Not all of the technologies in the simulation exist yet. The **Future Long-Range
Assault Aircraft** – the Army’s planned next-generation heavy assault helicopter
intended to replace the CH-47 Chinook – appeared in the 3D Sandtable rendering but
was represented in the live desert exercise by actual Chinooks standing in for the
unfielded aircraft. **Brig. Gen. Zachary Miller**, Joint Modernization Command commander,
said the Army is using the experiment to understand how the new aircraft will be
integrated into operations before it arrives, rather than waiting until after it
is fielded to start working out the doctrinal questions.

---

## What the Experiment Showed – and What It Did Not

**Lt. Gen. Joel Vowell**, Deputy Commanding General of U.S. Army Pacific, offered
the most straightforward summary of what Capstone 5 demonstrated on the CJADC2 side:
that multiple U.S. services and partner nations could take different programmes 
and systems and have them contribute to one common operating picture, with data 
accessible and usable by commanders and staff.

“That’s very helpful for commanders to be able to see data, or have a staff access
the data, make sense of it and visualise it, understand it, comprehend it and use
it,” he said.

But Vowell was equally clear that declaring CJADC2 fully operational remains a distant
prospect. Technical barriers aside, policy obstacles also slow progress. Information-
sharing rules between the U.S. and some allied nations – governing what data can
move between unlike systems and across different security classification levels –
limit what is practically achievable even when the technology works. “There are 
policy issues on information sharing with some of our allies and partners,” Vowell
said.

Asked when the Pentagon might declare CJADC2 complete, he declined to name a date.“
I don’t know if there’s a horizon timeline. I just know five years ago, we weren’t
this close. We are a lot closer.”

The Army is also dealing with an institutional reality: it now tests around 250 
different technologies under the Project Convergence umbrella, many of them related
to command and control and networking, but not all. That breadth reflects genuine
operational appetite for experimentation, but it also means each capstone is an 
immense coordination challenge.

---

## Looking Ahead

**Project Convergence Capstone 6** is scheduled for August 2026, and the Army has
already set its ambition: expand the common operating picture from battalions to
full divisions, nearly doubling the scale of the human-machine information architecture
that Capstone 5 validated at the lower echelon. Whether the edge data mesh, the 
NGC2 software, and the AI-curated common operating picture hold up under that scale,
and across the full range of allied systems that a coalition force would bring, 
is the next question the Army needs to answer.

The overarching goal – a genuinely seamless sensor-to-shooter network spanning all
domains and all coalition partners – is not one that any single capstone will deliver.
But the distance between where the Army started with Project Convergence and where
it stands after Capstone 5 is real and measurable. The data architecture is cleaner,
the common operating picture reaches further down the chain, the allied integration
is more mature, and the autonomous systems in the logistics, engineering, and maritime
lanes are further along than they were a year ago.

That incremental progress is the point. As Hodne put it at the Army Research Laboratory
briefing, the experiment “allows us to mature capability. It allows soldiers to 
interact with [tools], give feedback, write better requirements.” In an era when
the gap between commercial technology and military fielded capability risks widening
rather than closing, the deliberate, iterative logic of Project Convergence is among
the more credible answers the Army has to that problem.

### Share this:

 * [  Facebook ](https://futuremilitarytech.com/inside-the-armys-project-convergence-capstone-5-cjadc2-tested-at-scale/?share=facebook)
 * [  X ](https://futuremilitarytech.com/inside-the-armys-project-convergence-capstone-5-cjadc2-tested-at-scale/?share=x)

### Like this:

Like Loading…

### _Recommended for you_
